Services · The specialty
Bathroom Remodeling
Walk-in showers, freestanding tubs, tile set like it's going in our own house, because our name is on it.
The work
Bathrooms are where our tile work shows. Herringbone marble, stacked glass, hexagon mosaic pans, niches that line up with the grout lines. We set it all in-house. From gut demo to the final bead of silicone, the same crew that starts your bathroom finishes it.
A bathroom is the hardest room in the house to get right: waterproofing, slopes, valves, glass, stone, and electrical all packed into a few square meters. We gut to the studs, fix what's hiding in the walls, and build back with proper waterproofing before a single tile goes on. Clients call out the inside-the-wall quality in reviews because we treat what you can't see as seriously as what you can.
Written, itemized estimates. Clients who compared six companies chose Artigiano on both price and quality, and three-phase payments tied to progress keep both sides protected.
Full gut renovations
Down to the studs, corrected framing and subfloor, built back right.
Walk-in showers
Curbed or curbless, benches and niches, frameless glass measured to the millimeter.
Tile & stone
Marble, porcelain, glass mosaic — patterns laid out dry before they're set.
Tubs & wet rooms
Freestanding soakers, floor-mount fillers, tub-and-shower combinations.
Vanities & counters
Custom vanities, stone tops, framed mirrors, and sconce lighting.
Plumbing & electrical
Licensed plumbers and electricians handle rough-in and fixtures.
Typical projects
- Master bath turned into a true suite
- Dated hall bath modernized for resale
- Tub-to-walk-in-shower conversion
- Powder room with statement finishes
A full bathroom remodel typically runs 2–4 weeks on site once materials are in hand.
How it runs
Walkthrough & estimate
We look at what's there, talk about what you want, and price it line by line — free.
Materials & planning
Tile, stone, fixtures, glass — we help you select and source all of it to fit the budget.
The build
Demo, waterproofing, tile, and finish by our own crew; licensed subs on plumbing and electrical.
Final walkthrough
Grout lines, glass, caulk, pressure. We check everything together before we're done.
Recent work
From our bathrooms.








Questions
Asked on every bathrooms job.
How long will my bathroom be out of commission?
Plan on 2–4 weeks for a full remodel. Demolition starts once your materials are on hand. That's how projects finish on schedule.
Do you do the waterproofing yourselves?
Yes. Shower pans, curbs, and wall membranes are core to our tile work, and it's the part of the job we refuse to rush. What's inside the wall matters as much as the tile you see.
Can you match a design we found online?
Bring us the photo. Herringbone marble, stacked glass, black hex pans, brass or matte-black trim. Most of what's in our gallery started as a client's inspiration picture.
Is the glass custom?
Shower glass is measured after tile is complete and fabricated to the opening, so frameless doors and panels fit tight and swing true.
Send a photo of your bathroom as it stands. We'll scope what it can become and what it takes to get there.
Walk the space with us. Get a real number.
A free in-home walkthrough and a written, line-item estimate.
